Philippine Ore Prices Strengthened Sharply, With Multiple Supply-Side Risks Supporting the Cost Floor

Philippine nickel ore prices rose sharply this week. In terms of pricing, Philippine nickel ore CIF China: NI 1.3% grade at $58-63/wmt, NI 1.4% grade at $65-69/wmt, and NI 1.5% grade at $72-76/wmt, up $4 from the previous week. The average CIF price from the Philippines to Indonesia was $62.5/wmt for 1.3% grade and $69.5/wmt for 1.4% grade. Supply side, the Philippines was in a transition to the dry season, but affected by a developing low-pressure area (LPA) east of Mindanao, heavy rainfall continued in mining hubs such as Surigao and Homonhon Island. Although Metro Manila and most of Luzon had sunny and hot weather, the probability of weekly rainfall exceeding 50 mm in Surigao and the Caraga region was “high to extremely high,” and strong thunderstorms and scattered rainfall were expected to further intensify from March 9 to 13. Influenced by the LPA trough and the Dongfeng, this persistent rainy weather could continue to disrupt open-pit mining and vessel loading operations in the southern regions mentioned above. Currently, available spot cargo in the market was limited; coupled with the tightness in nickel ore supply and a potential demand gap driven by expectations of RKAB quota cuts in Indonesia, mainstream prices for Philippine nickel ore have risen markedly in recent periods. As of Friday, March 6, China’s port nickel ore inventory stood at 5.73 million mt, down 370,000 mt WoW. Current total port nickel ore inventory was equivalent to metal content of about 45,000 mt Ni. Demand side, domestic NPI prices rose this week, while spot transaction prices fell by about 1,092.6 yuan/nickel unit. From the perspective of smelters’ procurement departments, given ample earlier stockpiling and limited acceptance of recently extremely high-priced ore, most were currently staying on the sidelines. In terms of ocean freight rates, ocean freight rates rose sharply recently due to the situation in Iran, with the ocean freight rate from the Philippines to Tianjin Port at $11/mt. Looking ahead, Philippine nickel ore prices are expected to fluctuate at highs.


Indonesia Market: Tight Supply and Demand Drove Premiums Higher; Authorities Clarified the RKAB Supplement Mechanism

Indonesia's local nickel ore prices rose significantly this month. For the first half of March, the Indonesian nickel ore benchmark price (HPM) was set at $17,104/dmt, down 3.21% MoM. According to SMM data on Indonesia nickel ore premiums, the average premiums for 1.4%, 1.5%, and 1.6% grade laterite nickel ore were reported at $34, $38, and $38.5/dmt, respectively. Among them, the port arrivals under domestic trade price for 1.6% grade was $65.2–72.2/wmt. The dual strengthening of premiums this month reflected the release of smelters’ restocking demand and pessimistic expectations over RKAB quota reductions; meanwhile, the delivered price of 1.2% grade limonite ore also edged up in tandem to $24–26/wmt. Supply and demand fundamentals, as of March 6, Sulawesi and Halmahera were in a period of wild swings at the tail end of the rainy season, and intermittent heavy rainfall continued to hinder mine logistics. Morowali was currently overcast with extremely high humidity (94%); although rainfall remained light for now, a strong rainfall system was expected around March 13, with precipitation reaching 48 mm. Konawe likewise remained mostly cloudy with daily thunderstorms. Meanwhile, Halmahera was set to face a high-precipitation weekend, with the probability of thunderstorms as high as 65% on March 7–8. Although Indonesia’s Meteorology, Climatology, and Geophysics Agency (BMKG) forecast that the dry season would arrive earlier in April, the above areas were still unable to reach full-load mining and loading capacity due to highly saturated soil moisture and localized gusts. Under the dual pressure of tight tradable availability and uncertainty over RKAB quotas, some NPI smelters were forced to significantly step up procurement this month to secure raw material supply. While spot supply of limonite ore was relatively ample, a tailings dam landslide incident at certain MHP projects in an Indonesian industrial park kept the relevant production lines operating at low load, resulting in a phase of overall demand weakness. However, considering concerns among some Indonesian smelters over uncertainty in RKAB approvals, raw material stockpiling needs for newly commissioned projects, and continued growth in demand from outer islands, limonite ore prices were expected to closely track saprolite ore and remain elevated. Policy side, regarding recent widespread market rumors that “production quotas (RKAB) will be uniformly increased by an additional 25%–30%,” Tri Winarno, Director General of Minerals and Coal at Indonesia’s Ministry of Energy and Mineral Resources (ESDM), clarified on March 3, 2026 that RKAB increases would be based on individual assessments of enterprises’ production capability and compliance, rather than a uniform proportional increase, and indicated that the approval process would begin in H2 2026. Officials emphasized that this move was a routine regulatory process to optimize resources, not a passive offset against the previous production cap policy.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?sign in here